Environmental Product Declaration I Di Indonesia

tes 1 yuyuguygyugyugygiygygiviyviyvvvv

tes 2 hbyubyubyubiuyviuyviyiybyb
link web https://api.environdec.com/api/v1/EPDLibrary/Files/5de7cbd9-c4f8-4e3c-ac67-08d9952442c5/Data
clients
CLIENTS
SUMMARY OF CONSULTANCY, AUDITING AND TRAINING (September 2003 – ahead)
| Logo | Company | Roles | Time |
![]() | PT Enkei Indonesia – automotive wheel | EMS and OHSAS Consultant and Tutor (with SSPM)* | Sept. 2003 – Feb. 2004 (23mandays) |
![]() | PT Astra Daihatsu Motor Casting Plant – machinery | EMS & OHSAS Consulting Auditor (with SSPM)* | Sept. 2003 (2 mandays) |
| PT Centex – textile | Training and Consultancy for ISO 14001 | Oct. 2003- Sep. 2004(20mandays) | |
| PT Indominco Mandiri – Coal Mining | Consultancy for ISO 9001, ISO 14001 and OHSAS 18001 | Nov. 2003– Sep 2004 (60mandays) | |
| PT Kaltim Prima Coal – Coal Mining | Consultancy for ISO 14001 | Feb – June 2004 (15 mdys) |
| PT Citra Insulindo Abadi – Drilling company | Consultancy for ISO 9001 | April -July 2004 (20 mdys) | |
| Lemigas – Laboratories | Consultancy for ISO 14001 and OHSAS 18001 (with Talenta) | May – December 2004 (40 mdys) | |
| Suku Dinas Kesehatan Masyarakat Jakarta Timur – Public Institution | Consultancy for ISO 9001: 2000 | September – Jan. 2005 (20 mandays) | |
| Suku Dinas Kesehatan Masyarakat Jakarta Barat – Public Institution | Consultancy for ISO 9001: 2000 | September – Jan. 2005 (20 mandays) | |
| PT Alami Agro Industri – Food canning | Consultancy for ISO 9001 and HACCP | December 2004 – July 2005 (40 mandays) | |
| PT Vosen Pratita Kemindo – chemicals | 1) Consultancy for ISO 14001 and OHSAS 18001;2) Consultancy for IMS (9001/ 14001/ OHSAS 18001/ ISO 22000) | 1) Oct 2004 – March 05 (20 mandays);2) Nov 2008 — Now |
| Puskesmas Kecamatan Kembangan – Public Health Center | Consultancy for ISO 9001 | Dec 2004 – April (20 mdys) | |
| Kondur Petroleoum SA – Exploration and production of crude oils | Consultancy for ISO 14001 in line with OHSAS 18001Compliance Evaluation | Dec. 2004 – April (40 mdys)2005 (10 mdys) |
| Puskesmas Kecamatan Ciracas – Public Health Center | Consultancy for ISO 9001 | April – Des 2005(20 mdys) | |
| Puskesmas Kecamatan Kalideres – Public Health Center | Consultancy for ISO 9001 | April – Des 2005 (20 mdys) | |
| PT Samcon – Electronic manufacture | Consultancy for ISO 14001 | April 2005 – Jan 2006(23 mdys) | |
| PT Daqing – Oil Exploration, Construction and Drilling Company | Consultancy for ISO 14001 and OHSAS 18001 (with CIC)* | June-Sep 2005 | |
| PT Equinox – Shipping company | Consultancy for ISO 14001 and OHSAS 18001 (with Inquest)* | June-Sep 2005 |
| PT Yamatake Berca – Instrumentation | Consultancy for ISO 9001 | Jan 2006- July 2006 | |
| PKM Tamansari – Public Helath Center | Consultancy for ISO 9001 | March-Nov 2006 | |
| Kodeco Energy Ltd – Oil and gas onshore and offshore operation | Consultancy for ISO 14001Consultancy for OHSAS 18001 | May – Dec 2006 March – Dec 2006 |
| Proper department (Ministry of Environment) | Consultancy for ISO 9001 | May – Dec 2006 (15 mdys) | |
| Magma Nusantara Ltd | Consultancy for OHSAS 18001: 1999 | February – Dec 2007 (30 mandays) | |
| PT Elnusa Drilling Services | Consultancy for OHSAS 18001: 1999 | April – Nov 2007 (30 mandays) | |
| Puskesmas Tangerang | Consultancy for ISO 9001: 2000 | March – Sep 2007 (30 mandays) | |
| Biro Keuangan, Depnakertrans | Consultancy for ISO 9001: 2000 | March – September 2007 (25 mandays) | |
| PT Geolink Nusantara | Consultancey for ISO 9001: 2000 | July 2007 – Jan 2008 (25 mandays) | |
| PT Darma Henwa Tbk | Consultancy for ISO 9001: 2000 and ISO 14001: 2004 | September – January 2007 (10 mandays) | |
| PT Singgar Doris Engineering | Consultancy for ISO 9001: 2000 | February – October 2008 (25 mandays) | |
| UNIDO & Ministry of Environment | Consultancy for national solvent phase out | Dec 2006 – Sep 2008 (22 manmonth) |
| Biotrop (Agriculture Research( | Consultancy for ISO 9001: 2000 | April – October 2008 (30 mandays) |
| PT Inco Indonesia – Nickel Mining | Identification of environmental aspects (outsourced by ERM)* | June 2008 (14 mandays) |
| PT Istaka Karya – Contractor | Consultancy for OHSAS 18001: 2007 | May 2008 – now (30 mandays) | |
| PLIB | Consultancy for ISO 9001: 2008 documentation development | February-June 2009 (20 mandays) | |
| PT Astra Daihatsu Motor (HO & 4 plant sites) | Consultancy for OHSAS 18001: 2007 | January 2009 – Jan 2010 (100 mandays) |
| PT Yamaha Music Manufacturing Indonesia | Consultancy for OHSAS 18001: 2007 | May 2009 – Feb 2010 (25 mandays) | |
| World Bank/ KLH | National Consultant for Dioxin and Furan Inventory supporting Protocol Stockholm | April 2009 – Now (80 mandays) |
| World Bank/ KLH | Consultancy for Ozone phase out in MDI, Foam and Aerosol sources | Nov 2009 – Now (12 months) |
| PT Syngenta Indonesia | HSE compliance audit (Note: as project manager) | Jan – March 2010 (20 mandays) | |
| PT Star Energy | OHSAS 18001 | May 2010 (40 mandays) |
| PT Jorong Barutama Greston | OHSAS 18001 | June – 2010 (44 mandays) | |
| PT Tenang Jaya Sejahtera | Environmental audit on behalf of KLH | Dec 2010 – Agustus 2011 | |
| PT Smart Tbk | Environmental audit on behalf of KLH | Jan 2011 – September 2011 | |
| PT Andalas Merapi Timber | Environmental audit on behalf of KLH | April 2011 – November 2011 | |
| PT Gorontalo Mineral | QMS, EMS and OHSAS integrated | October 2011 – April 2012 (35 mandays) | |
| PT Citra Palu Minerals | QMS, EMS and OHSAS integrated | December 2011 – June 2012 (30 mandays) | |
| PT Tunas Inti Abadi | Environmental audit on behalf of KLH | April 2011 – December 2012 | |
| PT Borneo Indo Bara | Environmental audit on behalf of KLH | April 2011 – December 2012 | |
| CNOOC SES Ltd | Oil and gas production (offshore and onshore) | March 2012 – December 2013 (50 mandays) | |
| PT MMID (MM2100) | Energy management system ISO 50001 (Concept design) | October – December 2012 | |
| CNOOC SES Ltd | Oil and gas production (offshore and onshore) – PROPER BLUE/ GREEN | February 2013 – June 2013 | |
| PHE WMO | Oil and gas production (offshore and ORF) – PROPER GREEN | ||
| PGN SBU 2* | Environmental transformation (Green company, Energy management system, PROPER, Environmental management system, Waste management) | May 2013 – December 2013 |
| PT Pinang Witmas | ISPO | June – December 2014 | |
| PT Keramika Indonesia Asosiasi | ISO 14001 | April 2014 – Now | |
| PT Samator Indonesia | ISO 9001, ISO 14001, OHSAS 18001 | March 2014 – Now | |
| Unit Pelayanan Terbuka, KLH | ISO 9001 (planning to implementation) | September – January 2014 |
| Pusdiklat, KLH | ISO 9001 (implementation only) | October – February 2015 |
| PT Prakarsa Tani Sejati | ISPO | October 2014 – September 2015 | |
| Domestic waste division, KLH | Development of policy, strategy and program implementation for national domestic waste management** | October – December 2014 |
| PT Greencap | HSE plan | April – August 2015 | |
| PT PPLI (waste management services) | Environmental audit based on PerMen 03/2013 | April – November 2015 |
| PT Loreal Indonesia | OHS management system | May – August 2015 | |
| PT Keramika Indonesia Asosiasi (Pabrik keramik di Cileungsi, Karawang, Gresik) | Environmental Management System based on ISO 14001: 2004 | June 2014 – May 2015 | |
| PT Cedefindo | Integrated quality, environmental and OHS management system based on ISO 9001: 2015, ISO 14001: 2015 and OHSAS 18001: 2007. | August – December 2015 |
| Ministry of Environment, Directorate of PKLAT | National Plan on open access sites | July – November 2015 |
| PT Energi Management Indonesia (EMI) | Energy management system ISO 50001: 2011 | August – December 2015 |
| PT AGI (Samator) | Integrated quality, environmental and OHS management system based on ISO 9001: 2015, ISO 14001: 2015 and OHSAS 18001: 2007. | October 2016 – Now | |
| PT Haesung (Parts for automotive) | ISO/TS 16949. | February – November 2016 | |
| PT Energi Management Indonesia (EMI) | Job analysis | January – June 2016 |
| Ministry of Environment, Directorate General of PSLB3* | Developing guideline on foreign cooperation | July – November 2016 |
| PT Dahana (Persero) (Explosives manufacture) | Environmental audit based on PerMen 03/2013 | May – December 2016 |
| Ministry of Environment, Directorate of B3* | Implementing Strategic Planning | September – December 2016 |
| PT Gistex (Nanjung Factory) | Energy management system ISO 50001: 2011 | April – December 2016 | |
| PT Total Oil Indonesia | Developing procedures | October 2016 – Now |
| PT Gistex (Nanjung Factory) and PT Gistex Chewon (Purwakarta Factory) | Integrated quality, environmental and OHS management system based on ISO 9001: 2015, ISO 14001: 2015 and OHSAS 18001: 2007. | December 2016 – Now | |
| PT Vosen Pratita Kemindo | Integrated quality, environmental and OHS management system based on ISO 9001: 2015, ISO 14001: 2015 and OHSAS 18001: 2007. | November 2016 – Now |
| PT Hadtex | Integrated quality and environmental management system based on ISO 9001: 2015 & ISO 14001: 2015 | Octeober 2016 – Now |
| Banpu Indonesia | Consultancy for ISO 17025Corporate management system integration | July – Dec 2007 (30 mandays)Dec 2006 – July 2007 (20 mandays) | |
| PT Indocement TP Tbk (Citeureup Plant) | Environmental Audit on the basis of PerMen No 03/2013 | December 2016 — Now | |
| PT Indocement TP Tbk (Tarjun Plant) | Environmental Audit on the basis of PerMen No 03/2013 | December 2016 — Now | |
| PT Indocement TP Tbk (Cirebon Plant) | Environmental Audit on the basis of PerMen No 03/2013 | December 2016 — Now | |
| PT Holcim (Cilacap Plant) | Environmental Audit on the basis of PerMen No 03/2013 | January 2017 — Now |
| PT Semen Tonasa | Environmental Audit on the basis of PerMen No 03/2013 | Mei 2017 — Now |
| PT Multi Bintang Indonesia Tbk | PROPER GREEN | Mei 2017 — Now | |
| * | PT Bureau Veritas Indonesia – Certification Body | Outsource as auditors for QMS, EMS and OHSAS | October 2006 – Now |
| * | PT SGS Indonesia – Certification Body | Outsource as auditors and tutors for QMS, EMS and OHSAS | September 2003 — Now |
| * | PT Sucofindo ICS | Outsource as auditors for QMS and EMS | September 2003 — Now |
| ** | Executed as personnel contract |
PENERAPAN FAULT TREE ANALYSIS DALAM AUDIT RISIKO TINGGI LINGKUNGAN
PENERAPAN FAULT TREE ANALYSIS DALAM AUDIT RISIKO TINGGI LINGKUNGAN
Fault Tree Analysis
Deskripsi: FTA digunakan dalam safety dan penyelesaian masalah reliabilitas. FTA mencakup penyelesaian masalah deduktif untuk memahami konsekuensi dari suatu event.
Proses: Model FTA bekerja mundur (backward) untuk memahami dan mendeduksi apa yang menyebabkan suatu event. Proses mengikuti tahap-tahap:
- Mendefinisikan event yang tidak diinginkan;
- Mengidentifikasi penyebab-penyebab langsung dari suatu event;
- Melanjutkan analisa identifikasi penyebab-penyebab hingga basis dan penyebab akar diidentifikasi
- Menciptakan suatu diagram logis yang menunjukkan hubungan event yang logis
Pemakaian: FTA digunakan di safety, desain, konstruksi, dan pembuatan software.
Kekuatan dan Kelemahan: Kekuatan FTA meliputi:
- Identifikasi metoda atas bawah hubungan-hubungan berbeda;
- Identifikasi penyebab2 dasar menuju ke event puncak;
- Mengikuti analisa sistematis logika risiko untuk mengidentifikasi penyebab2 fundamental;
- Identifikasi penyebab2 kegagalan;
- Identifikasi kelemahan dan sistem yang kompleks;
- Memprioritaskan penyebab2 kegagalan;
- Menyediakan analisa kualitatif dan kuantitatif pada event puncak
Kelemahan FTA meliputi:
- Dapat menyebabkan ujung buntu karena analisa melihat mundur;
- Dapat menyebabkan hubungan kompleks antara penyebab dan event;
- Mengidentifikasi penyebab2 dasar dengan salah
Sumber: Hutchins, G. 2018. ISO 31000: 2018 Enterprises Risk Management. CERM Academy Series on Enterprise Risk Management.
LCA
LCA
Metoda LCI (Life cycle inventory)
LIFE CYCLE ASSESSMENT (LCA)
Metoda Life Cycle Inventory (LCI)
Langkah LCI dalam standar ISO 14040 dan 14044 meliputi kompilasi dan kuantifikasi data masukan/ keluaran bagi suatu sistem produk yang diberikan sepanjang daur hidupnya. LCI merupakan bagian studi LCA yang paling menghabiskan waktu, kompleks dan menuntut sumber daya dan oleh karenanya fasa yang sangat kritis dalam seluruh aktivitas LCA, seperti tingkatan kuantifikasi masukan dan keluaran secara langsung mengikuti analisa dampak dan interpretasi kegiatan-kegiatan. Pengumpulan produksi senyawa kimia dalam LCI dapat sangat kompleks dan menantang. Beberapa metoda telah diusulkan dalam beberapa decade supaya ada proses inventori.
Suh dan Huppes (2005) dalam Maranghi dan Brondi (2020) mengidentifikasi tiga tipe pendekatan, misalnya, komputasi, analisa EIO (Economi Input Output) dan kombinasi dari dua pendekatan ini.
- Diagram alir proses adalah tertua dan praktek paling umum dalam kompilasi LCI dengan menunjukkan bagaimana proses suatu sistem produk terinterkoneksi melalui aliran-aliran komoditas.
- Representasi matrik dimana suatu sistem persamaan linear digunakan untuk menyelesaikan masalah inventori (Suh dan Huppes (2005) dalam Maranghi dan Brondi (2020))
- Hibrida mengaitkan berbasis-proses dan analisa EIO dan mengupayakan untuk mengeksploitasi kekuatan dan keunggulan dari masing-masing dua pendekatan ini.
William et al et al. (2009) mengenalkan nomenklatur yang berbeda, membedakan menjadi pendekatan ‘bottom-up’, top down dan hybrid.
- Bottom Up adalah setiap proses sepanjang rantai pasok produk dideskripsikan dalam arti masukan dan keluaran yang sesuai. Pendekatan ini bergerak dari tingkatan paling detil dengan mengidentifikasi kegiatan transformasi paling kecil secara bertahap digabung dengan proses-proses lain menuju paling transformasi proses paling besar.
Pengambilan Data Langsung. Kompilasi LCI dengan pendekatan ini membutuhkan kompilasi informasi kuantitatif tentang masukan dan keluaran dari satu unit proses ke unit proses. Koleksi data dilakukan di lokasi produksi/ manufaktur yang berarti data mentah di pabrik dan merubahnya menjadi entri inventori (masukan material dan energi, ko-produk, emisi, aliran limbah). Data mentah di fasilitas dapat diperoleh dari beberapa sumber-sumber relevan, misalnya, dari bill of material, data pemantauan proses, kuesioner atau survai ke personil pabrik dan melakukan pengukuran lapangan.
Metoda Berbasis Proses. Metoda berbasis proses berfokus pada proses produksi untuk memperoleh data inventori terkait dengan produksi pada senyawa kimia tertentu.
| Pendekatan | Informasi Tersedia | Aliran Material dan Energi |
| Kimia proses | Stoikiometri reaksi, yield, panas reaksi | Reaktan, produkKebutuhan energi terkait reaksi |
| Desain Proses Konsep | Unit operasi, neraca massa, neraca energi | Reaktan, produk, material tambahan, aliran limbah, emisi fugitiveKebutuhan energi terkait proses |
| Pemodelan dan simulasi proses | Ukuran peralatanJejaring integrasi energi yang mungkin | Reaktan, produk, material tambahan, aliran limbah, emisi fugitiveKebutuhan energi terkait pabrik, hilang-hilang |
- Top down memulai dari umum, biasanya ekonomi dan/ atau berbasis ekonomis, data dengan tujuan untuk mengekstrak informasi proses-spesifik dalam bentuk inventori masukan-keluaran ekonomi;
- Hybrid adalah kombinasi antara dua pendekatan.
Pustaka
Maranghi, S. Brondi, C., 2020. Life Cycle Assessment in the Chemical Product Chain.